AQUA Engineering
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News

Extell Development Company
Ventana Pump Station - Deer Valley East Village Snowmaking System


The Ventana Pump Station supplies raw water for snowmaking across the Deer Valley East Village resort, one of the high-head pumping facilities in a system that sources water from Jordanelle Reservoir and conveys it through pump stations, pipelines, storage, and valve stations.

High-head snowmaking pumping at this scale produces severe operating and transient conditions. AQUA built a hydraulic surge model of the station to quantify pressures, which exceed 500 psi at the design duty point and can surpass 800 psi under transient events, and used the results to size the ten pumps (about 4,000 total horsepower, over 10,000 gpm) and to specify high-pressure materials and appurtenances, including 600-pound flanged connections. The cast-in-place structure draws directly from the adjacent 600,000-gallon raw-water tank, avoiding a wet well.

Originally assigned to others, the complete pump station design was taken on by AQUA, which serves as Engineer of Record and manages procurement of long-lead equipment and materials in coordination with the Owner and General Contractor through construction.
Picture
Picture
Picture
Picture
Project Summary:
Client
Extell Development Company
Reference
*Available upon request
Location
Wasatch County UT
Features
  • High pressure, high capacity pump station
  • Raw water supply for snowmaking (Mayflower / Deer Valley)
  • Cast-in-place concrete structure
  • Partially bunkered into mountainside
  • ​Ten 400 HP vertical turbine pumps
  • 10,000+ gpm capacity
  • 600+ psi total dynamic head
  • 800+ psi surge pressures
  • High-performance materials and equipment
  • 600 lb flanged connections
  • Hydraulic transient modeling
  • Engineer of Record (AQUA)
  • Equipment and materials procurement (AQUA-led)
  • Owner and contractor coordination
Contact Us

Related Project Experience

Picture

Town of Bennett
Water Storage Tank and Booster Station

Picture

Signal Hill ​Water Treatment Facility
​and Lost Creek Pipeline

Picture

Deer Valley East Village
Water Master Planning and Design

AQUA Engineering
Links
Search
Utah Office
533 W 2600 S, Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Millikan Way, Suite 300
Beaverton, OR 97005
801.683.3733
Solutions
Company
​​Team
Experience
News​​
Careers
Contact​​
© 2021 AQUA Engineering. All Rights Reserved.