Extell Development Company
Mayflower Water Treatment Facility
|
AQUA provided full engineering and currently providing construction support services for the development of the Water Treatment Facility at Mayflower Mountain Resort. This included permitting, design engineering, preparation of construction documents and specifications, bidding assistance, contractor selection, construction management, commissioning, and project closeout.
The water system improvements consist of chlorination facilities, two completed water storage reservoirs, and a third currently in design (see Project 4). Over 6,000 linear feet of distribution piping has been installed, with an additional 2,000 linear feet in active design. Multiple air release valves and vaults have been constructed, with additional units under evaluation for inclusion in the upcoming pipeline work. All engineering and project management services for this project are being performed by our team in the Bountiful office. |
Project Summary:
Client |
Extell Development Company |
Reference |
*Available upon request |
Location |
Wasatch County UT |
Features |
|