Central Valley Energy Recovery Project
August 2013
ALPRO Energy & Water was awarded a contract to assess the feasibility of upgrading Central Valley Water Reclamation Facility’s existing treatment plant. AQUA Engineering is excited to be part of ALPRO’s team. The study evaluates upgrades to the anaerobic digesters, the hot water system, the gas treatment system, and generation system. If the project is deemed feasible, ALPRO will be the solids manager building and operating a receiving station that will accept municipal biosolids, FOG, and food waste products to be co-digested in the existing digesters.
ALPRO Energy & Water was awarded a contract to assess the feasibility of upgrading Central Valley Water Reclamation Facility’s existing treatment plant. AQUA Engineering is excited to be part of ALPRO’s team. The study evaluates upgrades to the anaerobic digesters, the hot water system, the gas treatment system, and generation system. If the project is deemed feasible, ALPRO will be the solids manager building and operating a receiving station that will accept municipal biosolids, FOG, and food waste products to be co-digested in the existing digesters.
AQUA Engineering
|
Oregon Office
4145 SW Watson Avenue, Suite 350 - #347 Beaverton, OR 97005 801.683.3733 |
Links
|
Search
|
© 2021 AQUA Engineering. All Rights Reserved.