AQUA Engineering
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News

City of Beaumont
​Wastewater Treatment Facility Expansion


AQUA Engineering, working in partnership with Webb and Associates, was selected to plan and design the expansion from 4 MGD to 6 MGD. The project was structured around three primary objectives:
​
  • Producing recycled water that meets regional reuse standards
  • Lowering effluent total dissolved solids to satisfy the basin management plan,
  • Increasing overall treatment capacity.

The project included upgrading this existing biolac treatment plant to provide recycled water and reduce TDS in the effluent.  The design approach required significant effort to create an implementation and phasing plan allowing operations to meet existing treatment needs while building the new facilities in the same footprint.  As such, the fine screening facility, partial process tankage, and MBR/RO facility were constructed in place of 1 of 5 biolac basins.  Once these facilities were completed, the remaining biolac basins were removed, allowing the construction of the remaining process tankage, solids handling, and recycled water facilities.  

The improvements raised the treatment capacity to 6 MGD and include provisions for future expansion to 8 MGD by adding one additional process basin and modular membrane capacity to the existing MBR facility. Improvements to the existing headworks and UV disinfection process to allow for their continued use at the facility. This staged approach provides the City a clear path to accommodate future growth while maintaining compliance with current regulatory requirements. New processes at the plant include grit removal, fine screening, process basins (anerobic, anoxic and aerobic to achieve BNR), process blowers, membrane bioreactor, reverse osmosis, solids holding, and dewatering. 

Our electrical, instrumentation, and controls (EI&C) group (SKM) provided the EI&C engineering for the project as well as system integration services. For controls, SKM created P&ID’s, control narratives, panel designs, and loop drawings to assist the installing contractor in providing a well-built control system. Our programming staff provided PLC and HMI programming with intuitive operator interface that is simple yet power to use.
Picture
Picture
Picture
Project Summary:
Client
City of Beaumont
Reference
*Available upon request
Location
Beaumont, CA
Features
  • Design Bid Build
  • Grit Removal
  • Fine Screening
  • Process Basins (anerobic, anoxic and aerobic to achieve BNR)
  • Process Blowers
  • Membrane Bioreactor
  • Reverse Osmosis
  • Solids Holding
  • Dewatering
  • UV Disinfection
Contact Us

Related Project Experience

Picture

Eagle Mountain City Wastewater Treatment Plant (Type I/II Reuse)

Picture

WRCRWA Wastewater Treatment
​Plant Expansion

Picture

Springville
Wastewater Treatment Facility

AQUA Engineering
Utah Office
​533 W 2600 S, Suite 275
Bountiful, UT 84010
801.299.1327
Colorado Office
7935 E Prentice Avenue, Suite 100
Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Millikan Way, Suite 300
Beaverton, OR 97005
801.683.3733
Links
Solutions
Company
​​Team
Experience
News
​
Careers
Contact​​
Search
​
© 2026 AQUA Engineering. All Rights Reserved.