Town of Bennett, CO
Town of Bennett Laramie-Fox Hills Well 6
|
|
AQUA assisted the Town of Bennett with the design and construction management of a new well pump, site piping, temporary chlorination equipment and interim electrical equipment to operate the LFH Well 6 well. The system considered the development and equipping of a new 1,600 ft. deep potable water well along with a 150 HP vertical turbine pump station and one-million-gallon planned bolted steel storage tank and booster station immediately east of the KJF tank. The project was being delivered using a multi-phase Construction Manager At Risk (CMAR) project delivery approach where the Town, Engineer and Contractor work as a close team to deliver the project.
|
Project Study:
Client |
Town of Bennett |
Reference |
*Available upon request |
Location |
Bennett, CO |
Features |
|