AQUA Engineering
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News

Lodging Dynamics
​​
Colorado River Resort Water Treatment Facility


AQUA was hired to design a water treatment plant for two new hotels that were constructed near Moab. The plant has a floating intake system that pumps water from the Colorado River to the treatment facility. The treatment facility includes a Super Settler from Westech which is a small, inclined plate clarifier. The clarified water is then treated through a microfiltration skid. The treated water enters a new 260,000-gallon water reservoir. A pumping system was designed to feed the water to the new motel. In addition, a fire suppression pump was installed to address fire suppression. A building for all the equipment was designed. The facility has received a construction permits from the State and County and is currently producing water for two motels.
Contact Us
Project Study:
Client
Lodging Dynamics
Reference
*Available upon request
Location
Moab, UT
Features
  • Pre-Sedmentation Tank
  • Floating Intake System
  • Fire Suppression System
  • New Equipment Building
  • Chloring Disinfection
Download Project Profile

Related Project Experience

Picture

Hooper Water Treatment Plant

Picture

Emigration Improvement District
Upper Freeze Creek Well | Groundwater Development 

Picture

MRWSSD
Signal Hill Water Treatment Plant and Lost Creek Pipeline

AQUA Engineering
Utah Office
533 W 2600 S Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
​Greenwood Village, CO 80111
720.667.1250
Oregon Office
4145 SW Watson Avenue, Suite 350 - #347
Beaverton, OR 97005

801.683.3733
Links
Solutions
Company
​​Team
Experience
News​
​Careers
​​Contact
Search
© 2021 AQUA Engineering. All Rights Reserved.