Extell Development Company
Deer Valley East Village Phase II Water Modeling


As the Deer Valley East Village development expanded northwest into its Phase II areas (Lincoln, Pioche, Big Dutch Pete, and Hailstone), AQUA developed the drinking water hydraulic model and potable water master plan that set the design basis for the next stage of the system, extending the project’s hydraulic modeling into new, higher service areas rather than treating each as a standalone system.

Using a WaterGEMS model, AQUA evaluated indoor, outdoor, fire-flow, peak-day, and peak-instantaneous demand scenarios against state and JSSD pressure and flow requirements, and documented the basis of design in a Hydraulic Model Design Elements Report meeting Utah Division of Drinking Water rule R309-511. Demand criteria and Equivalent Residential Connection counts were established with JSSD, including evaluation of surplus capacity in the district’s Deer Crest system and a possible interconnection with the Phase I system.

The resulting master plan sized distribution, storage, and pumping for Phase II and sequenced the infrastructure to match phased development of the Lincoln and Pioche areas, with a prioritized improvements list and cost basis to guide subsequent design.

Picture
Picture
Picture
Project Summary:
Client
Extell Development Company
Reference
*Available upon request
Location
Wasatch County, UT
Features
  • Integrated system design (tank, pump, PRVs, flow control)
  • New pressure zone without modifying existing infrastructure
  • Standardized, repeatable PRV station design
  • Full SCADA and controls integration
  • Permitting and construction-phase support
  • Hydraulic Model​


Contact Us

Related Project Experience

Picture

Deer Valley East Village
​Pioche PRV

Picture

Deer Valley Tank No. 2
​and Pump Station

Picture

Elk Ridge Water System Improvements

AQUA Engineering
Links
Search
Utah Office
533 W 2600 S, Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Millikan Way, Suite 300
Beaverton, OR 97005
801.683.3733
Solutions
Company
​​Team
Experience
News​​
Careers
Contact​​
© 2021 AQUA Engineering. All Rights Reserved.