Extell Development Company
Deer Valley East Village Water Tank No. 2 and Pump Station


Water Tank No. 2, a 600,000-gallon buried reinforced concrete tank, extended the Deer Valley East Village potable system beyond the initial 1.2 MG service area, adding storage and a new pressure zone serving the Deer Valley East Village, Big Dutch Pete, and Hailstone Village areas. AQUA delivered the tank, valve vault, and supporting facilities as a turn-key package, sized within the system hydraulic model and supplied by Booster Pump Station No. 1 sited adjacent to the existing tank.

AQUA provided structural design of the buried, conventionally reinforced concrete tank and valve vault, along with tank-site civil design, electrical and controls, and SCADA integration that ties tank level into the existing Jordanelle Special Service District system. Permitting was carried through the Utah Division of Drinking Water, with coordination through MIDA and JSSD review. AQUA also designed the JSSD/Deer Valley East Village interconnect flow control facility governing the connection to the district transmission main.

When the tank was relocated during design, AQUA updated the hydraulic model for the revised location, re-validated storage capacity and fire flows, and revised the pump station duty point accordingly, keeping the facility consistent with the broader system. AQUA carried the work through construction observation, leak-test witnessing, and closeout.
Project Summary:
Client
Extell Development Company
Reference
*Available upon request
Location
Wasatch County, UT
Features
  • Master Planning
  • Funding Assistance
  • Hydraulic Modeling
  • Design & Construction
  • Water Storage Tanks
  • Pump Stations
  • Water Transmission
Contact Us

Related Project Experience

Picture

Town of Bennett Capital Asset Inventory Assessment & Master Plan

Picture

Indian Hills Water District Master Plan

Picture

Elk Ridge Water System Improvements

AQUA Engineering
Links
Search
Utah Office
533 W 2600 S, Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Millikan Way, Suite 300
Beaverton, OR 97005
801.683.3733
Solutions
Company
​​Team
Experience
News​​
Careers
Contact​​
© 2021 AQUA Engineering. All Rights Reserved.