Hyrum City
City Engineer | City Engineering and Water/Wastewater Infrastructure Improvements 


QUA has served as the Contract City Engineer for Hyrum City since 2006, providing comprehensive engineering, planning, design, construction administration, and development review services. Through this long-term partnership, AQUA has played a key role in maintaining and upgrading the City's water, wastewater, and transportation infrastructure to support community growth, improve system reliability, and meet evolving regulatory requirements.
 
As part of its ongoing capital improvement program, AQUA has designed and overseen the replacement of approximately 1,000 to 3,000 linear feet of aging water distribution infrastructure annually. These projects have focused on replacing undersized and outdated pipelines with 8-inch and larger water mains to meet State requirements for pipe sizing, materials, pressure, fire flow, and system reliability. The systematic replacement program has improved hydraulic performance, enhanced fire protection, and strengthened the long-term resiliency of the City's water distribution network.
 
One of the City's significant infrastructure improvements was the 2011 Water Improvement Project, which included approximately 3,100 linear feet of new 8-inch to 14-inch water main installation. The project required a cased crossing within a Utah Department of Transportation (UDOT) right-of-way, extensive coordination with multiple stakeholders, and careful construction planning to minimize traffic disruptions and avoid delays. In addition to the new transmission and distribution infrastructure, the project included replacement of all water service connections and the installation of two pressure reducing valve (PRV) stations to improve pressure management throughout the system.
 
Beyond water main replacement projects, AQUA has designed numerous facilities associated with Hyrum City's water supply, storage, and distribution systems, including groundwater development projects, storage improvements, booster pump stations, and pressure management facilities. These projects have enhanced system capacity and operational flexibility while supporting future community growth.

​AQUA has also provided extensive wastewater engineering services, including collection system improvements and treatment facility enhancements. Notably, AQUA designed and permitted a high-capacity wastewater effluent pump station capable of delivering approximately 2,100 gallons per minute to the City's pressurized secondary irrigation system. This innovative facility allows treated wastewater effluent to be beneficially reused for irrigation purposes, maximizing water resources while reducing demands on potable water supplies.
 
In addition to infrastructure design and construction support, AQUA assists the City with development review, utility planning, regulatory compliance, and long-term capital improvement planning. Through proactive engineering leadership and strategic infrastructure investments, AQUA continues to help Hyrum City maintain reliable utility services while preparing for future growth and water resource challenges.
Picture
Key Services Provided
  • Contract City Engineering Services
  • Water Distribution System Design
  • Water Main Replacement and Rehabilitation
  • Groundwater Development Projects
  • Pressure Reducing Valve (PRV) Station Design
  • Booster Pump Station Design
  • Water Storage System Improvements
  • Wastewater Collection System Engineering
  • Wastewater Treatment and Reuse Planning
  • Effluent Pump Station Design
  • Construction Administration and Inspection
  • Development Review and Approval
  • Capital Improvement Planning
  • Regulatory Compliance Support

Project Benefits
  • Improves water system reliability and fire protection
  • Replaces aging and undersized infrastructure
  • Enhances pressure management and hydraulic performance
  • Supports continued residential and commercial growth
  • Expands beneficial reuse of treated wastewater
  • Reduces demand on potable water supplies
  • Improves operational efficiency of utility systems
  • Ensures compliance with State design standards
  • Provides long-term infrastructure planning and technical leadership
Project Summary:
Client
Hyrum City
Reference
*Available upon request
Location
Hyrum, UT
Features
  • Annual Replacement of 1,000 to 3,000 LF of Water Main
  • Upgrades to 8-Inch and Larger Distribution Mains
  • Water Improvements
  • 3,100 LF of 8-Inch to 14-Inch Water Main
  • UDOT Right-of-Way Utility Installation
  • Two Pressure Reducing Valve Stations
  • Groundwater Source and Distribution Improvements
  • Multiple Potable Water and Irrigation Pump Stations
  • 2,100 GPM Wastewater Effluent Pump Station
  • Pressurized Secondary Irrigation Reuse System
Contact Us

Related Project Experience

Picture

Emigration Improvement District 
​​District Engineer

Picture

Elk Ridge City
​City Engineer

Picture

Grantsville City
​City Engineer

Picture

Mountain Regional Water
​District Engineer

Picture

West Wendover City
​City Engineer

AQUA Engineering
Links
Search
Utah Office
533 W 2600 S, Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Millikan Way, Suite 300
Beaverton, OR 97005
801.683.3733
Solutions
Company
​​Team
Experience
News​​
Careers
Contact​​
© 2021 AQUA Engineering. All Rights Reserved.