AQUA Engineering
  • Home
  • Solutions
    • Water & Wastewater Treatment
    • Municipal Services
    • Water Resources
    • Construction Services / Alternative Delivery
    • Asset Management / Master Planning / GIS
    • Resource Recovery / Renewable Energy
  • Company
  • Team
  • Experience
    • Project Experience
    • Brochures & Qualifications
  • News
  • Careers
  • Contact
  • Home
  • Solutions
    • Water & Wastewater Treatment
    • Municipal Services
    • Water Resources
    • Construction Services / Alternative Delivery
    • Asset Management / Master Planning / GIS
    • Resource Recovery / Renewable Energy
  • Company
  • Team
  • Experience
    • Project Experience
    • Brochures & Qualifications
  • News
  • Careers
  • Contact

Imperial County
Water Reclamation Facility MBR Upgrade


Imperial County, California, WRF - 5 MGD ZeeWeed MBR. (2009) This facility was 100% designed and approved the California Health Department. However, there was a downturn in growth and the County was not able to get funding to build the plant. This project includes a complete water reclamation facility with all process housed inside a metal building, excluding the coarse screening and grit removal facilities. The 5 MGD facility is expandable to 15 MGD. The facility was designed to treat wastewater from the County and surrounding industrial facilities and provide recycled water as well.

Imperial City, California, WRF - 2.4 MGD ZeeWeed MBR (In Construction 2020) The City of Imperial was not able to partner with the County and construct the previously mentioned facility at the County site. Thus improvements to their existing facility were required until the larger WRF could be constructed. AQUA/WEBB designed an upgrade for the existing WRF to be expanded to a 2.4 membrane bioreactor (MBR) facility. The total project cost is $20,000,000.
Contact Us
Project Study:
Client
Webb & Associates
Reference
Brian Knoll, Senior Vice President | P: 951.248.4279 | E: brian.knoll@webb@associates.com
Location
Imperial County, CA 
Features
  • Coarse screening 
  • Grit removal 
  • Fine screening 
  • Permeate pumps 
  • Permeate cleaning systems 
  • Effluent storage 
  • UV disinfection 
  • Process and membrane blowers 
  • Solids dewatering and loading 
  • Electrical and controls systems 
  • Aeration basins with fine bubble diffused aeration
  • Anoxic basins with eductor tube mixers 
  • Membrane trains utilizing Suez membranes
Download Project Profile

Related Project Experience

Picture

Oakley Water Reclamation Facility

Picture

Teton Valley Water Reclamation Facility

Picture

Springville
Wastewater Treatment Facility

AQUA Engineering
Utah Office
533 W 2600 S Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
​Greenwood Village, CO 80111
720.667.1250
Links
Solutions
Company
​​Team
Experience
News​
​Careers
​​Contact
Search
© 2021 AQUA Engineering. All Rights Reserved.