AQUA Engineering
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News

Indian Hills Water District
​Master Plan


Picture
Picture
The Indian Hills Water District Master Plan addresses the need for a comprehensive, forward-thinking strategy to support the community’s future growth and infrastructure demands. Recognizing the district’s anticipated expansion, this plan incorporates a detailed assessment of all key water utility components—including treatment facilities, booster stations, water lines, and storage—ensuring each asset is evaluated based on capacity, condition, and criticality. Special attention is given to the Groundwater Under the Direct Influence (GWUDI) system and water quality management, with a focus on nitrate treatment to safeguard public health. To further enhance service reliability, SCADA systems are modernized to expand operational control and monitoring capabilities, and advanced leak detection technology is introduced to mitigate water loss. Additionally, fire hydrant placement is strategically optimized to enhance fire safety across the community. Beyond delivering a static report, the Master Plan is structured within an interactive platform, allowing IHWD staff to make annual updates and plan adjustments. This GIS-based tool aligns with IHWD's vision, facilitating both immediate improvements and strategic, data-driven planning for future infrastructure projects.
Contact Us
Project Details:
Project Study:
Client
Indian Hills Water District
Reference
*Available upon request
Location
Indian Hills, CO
Features
  • Master Planning
  • Assessment
  • Evaluation
  • Expansion Recommendations
  • Treatment Facilities
  • Booster Stations
  • Water Lines & Water Taps
  • GWUDI System
  • Wells
  • Water Storage
  • High Nitrate Treatment Direction
  • Fire Hydrant Placement
  • SCADA Improvements and Expansion
  • Leak Detection Monitoring
  • Municipal Water Utility Operations
Download Project Profile

Related Project Experience

Picture

Bennett Capital Asset Inventory Assessment and Master Plan

Picture

Elk Ridge Water System Improvements

Picture

Mayflower Mountain Resort

AQUA Engineering
Utah Office
533 W 2600 S Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
​Greenwood Village, CO 80111
720.667.1250
Oregon Office
4145 SW Watson Avenue, Suite 350 - #347
Beaverton, OR 97005

801.683.3733
Links
Solutions
Company
​​Team
Experience
News​
​Careers
​​Contact
Search
© 2021 AQUA Engineering. All Rights Reserved.