Project Delivery


AQUA supports the full infrastructure project lifecycle. The same team carries a project from master plan through design, permitting, construction, and into long-term operations support. In phased resort development, this continuity means that infrastructure decisions made in early phases are understood in context when later phases are designed, eliminating interpretation errors and redesign costs that occur when new consultants start mid-program.
Capabilities Include:
Planning and Preliminary Engineering
AQUA's planning work is structured to produce actionable decisions. Master plans and preliminary engineering reports define the infrastructure investment required to support development objectives, identify constraints and risks, sequence capital improvements across phases, and establish the technical basis for regulatory submittals. Deliverables are designed to be directly usable by resort ownership, development teams, and financing parties.
  • System master planning and long-range capital improvement programs
  • Alternatives analysis and feasibility studies
  • Preliminary engineering reports and basis of design
  • System capacity analysis and deficiency identification
  • Capital improvement program development with cost projections and phasing schedules
  • Impact fee analysis and user rate studies
Design
Design services are structured to support both owner review and regulatory submittal. Phased submittals at 60, 90, and 100 percent completion allow resort ownership and regulatory agencies to review and comment before final document production. Construction documents are produced for competitive bidding and include technical specifications covering materials, installation requirements, and testing procedures appropriate to the facility type.
  • Phased submittals at 60, 90, and 100 percent for owner and regulatory review
  • Construction drawings and specifications for competitive bidding and construction
  • Coordination with architects, civil consultants, ski area planners, and resort development teams in active ski terrain
Permitting and Regulatory Coordination
  • State drinking water authority: source permitting, safe yield determinations, operating permits, and new system approvals
  • State environmental agency: wastewater treatment permitting and effluent disposal approvals
  • Dam safety authority: new permits, modification permits, hazard reclassification, and ongoing compliance
  • Right-of-way and corridor: DOT encroachment permits and highway utility license agreements
  • Environmental review: NEPA coordination, agency submittals, and permitting support
  • Water rights: administrative coordination for appropriations, exchanges, and transfers
Bidding and Procurement
  • Construction document final quality review and advertisement coordination for public procurement
  • Pre-bid meeting facilitation and addendum preparation
  • Bid evaluation, contractor reference verification, and recommendation
  • Contract execution support and preconstruction coordination
Construction Services
AQUA provides construction-phase engineering services scaled to project requirements. Full-time or part-time resident project representation is available depending on project complexity and owner preferences. For dam construction, full-time on-site observation and regulatory documentation are provided as a required component of dam safety compliance, separately from general construction oversight.
  • Full-time or part-time resident project representation
  • Shop drawing and submittal review
  • RFI response and design clarification
  • Pay application review and change order negotiation
  • Full-time dam safety construction observation and engineer's completion certification
  • Construction record keeping and as-built documentation
Startup, Commissioning, and Long-Term EOR Support
AQUA's involvement does not end at project closeout. System startup and commissioning support is provided through AES, and controls and SCADA verification is coordinated through SKM Engineering. Ongoing EOR engagement covers system modifications, expansion planning, emergency support, and long-term regulatory compliance as resort development continues.
  • System startup planning and commissioning coordination with AES
  • Controls and SCADA verification coordination with SKM Engineering
  • Operations and maintenance manual preparation and operator training
  • Ongoing EOR services: system modifications, expansion design, and regulatory compliance
  • Emergency engineering response
INQUIRE

Relevant Project Experience

Picture

Deer Valley East Village
​Water Treatment Facility

Picture

Nordic ​Village
​Venture Ski Resort

Picture

Deer Valley East Village
1.2 MG Culinary Water Tank

More Information

Picture
Picture

Ski Resort Infrastructure Brochure

Picture

Deer Valley East Case Study

Picture

What else do we want?

AQUA Engineering
Links
Search
Utah Office
533 W 2600 S, Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Millikan Way, Suite 300
Beaverton, OR 97005
801.683.3733
Solutions
Company
​​Team
Experience
News​​
Careers
Contact​​
© 2021 AQUA Engineering. All Rights Reserved.