Western Riverside County Regional Wastewater Authority
​Wastewater Treatment Plant Expansion


Picture
Picture
WRCRWA owns and operates a joint agency treatment facility near Corona, CA. AQUA Engineering, partnered with WEBB Associates, designed and assisted with construction services for this plant expansion from 8 MGD to 14 MGD. All plant components were addressed and improved as part of this upgrade, including the headworks, primary clarification, flow equalization, secondary treatment, tertiary filtration and disinfection, solids thickening, anaerobic digestion, solids dewatering, solids drying, and odor control. The plant capacity was increased while significantly reducing the power and operational costs associated with this facility. This facility loads automatically using screw conveyors and gates to deliver dewatered cake to each of the three drying beds. The Huber turner then turns, aerates, and assists in the drying process as the solids move through the solar drying beds. Finally discharge conveyors move the dried product to a truck loading facility where the solids are automatically loaded into trailers for hauling. This fully automated process reduces operator labor required for this process. Also, the plant’s solids hauling requirement is reduced by about 90% along with the associated disposal costs.
Contact Us
(Summary)
Project Study:
Client
WRCRWA
Reference
*Available upon request
Location
Riverside, CA
Size
14 MGD | Conventional Activated Sludge
Cost
$40 Million
Features
  • Anaerobic Digestion, Solar Drying, and Odor Control
  • 6.5 MGD to 8.0 MGD Restoration
  • Biological Treatment Capacity Increase
  • Development of Expansion Alternatives
  • 8 MGD to 13.50 MGD Expansion
  • UV Disinfection to Meet Title 22 Requirements
  • Hydraulic Modeling | Biological Modeling
  • Headworks
  • Primary Clarification
  • Flow Equalization
  • Bio-Reactor Expansion
  • Secondary Clarification
  • Tertiary Filtration
  • WAS Thickening
  • Oxidation Ditch
  • Chlorine Disinfection
Download Project Profile

Related Project Experience

Picture

Tooele Facility

Picture

City of Beaumont Wastewater Treatment Facility Expansion

Picture

Orem Wastewater Treatment Facility

AQUA Engineering
Utah Office
533 W 2600 S Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
​Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Milikan Way, Suite 300
​Beaverton, OR 97005
801.683.3733
Links
Solutions
Company
​​Team
Experience
News​
​Careers
​​Contact
Search
© 2021 AQUA Engineering. All Rights Reserved.