AQUA Engineering
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News

Hyrum City
​Municipal Services  |  300 South Boulevard Enhancement


The 300 South Boulevard Project was constructed in two phases. Phase 1 included the construction of all underground utilities such as culinary water, pressurized irrigation and sanitary sewer. Phase 2 included construction of approximately 5,000 feet surface improvements. 300 South Boulevard included raised, landscape medians and two travel lanes in each direction. The roadway required the demolition of a section of Mountain Crest High Schools parking lot along with the challenges of providing new access back into the school in several places. Another challenge of the project was the access onto SR165. AQUA obtained an access agreement and permit with the Utah Department of Transportation (UDOT) requiring a traffic impact study and construction of a 1,500 foot right deceleration lane off SR165 northbound lanes onto 300 South.
Project Summary:
Client
Hyrum City
Reference
*Available upon request
Location
Hyrum, UT
Features
  • Culinary Water
  • Pressurized Irrigation
  • Sanitary Sewer
  • ​Surface Improvements
Contact Us

Related Project Experience

Picture

Wendover Boulevard Enhancement

Picture

Pueblo Boulevard Beautification Project

Picture

Hyrum City Salt Hollow Park

AQUA Engineering
Utah Office
​533 W 2600 S, Suite 275
Bountiful, UT 84010
801.299.1327
Colorado Office
7935 E Prentice Avenue, Suite 100
Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Millikan Way, Suite 300
Beaverton, OR 97005
801.683.3733
Links
Solutions
Company
​​Team
Experience
News
​
Careers
Contact​​
Search
​
© 2026 AQUA Engineering. All Rights Reserved.