AQUA Engineering
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News
  • Home
  • Solutions
  • Company
    • Giving Back
  • Team
  • Experience
  • Careers
  • Contact
  • News

City of West Wendover
50 kw Solar System


West Wendover received funding for a 50 kW pole-mounted, grid-tied, solar photovoltaic project funded through the Energy Efficiency and Conservation Block Grants (EECBG) from the Nevada State Office of Energy (NSOE). Aqua Engineering generated contract documents and specifications including layout design, earthwork, and perimeter fencing. AQUA was responsible for project management, documentation and reporting to the NSOE.
Project Summary:
Client
City of West Wendover
Reference
*Available upon request
Location
Wendover, NV
Size
50 kW
Features
  • 50 kW Photovoltaic System
  • Pole-Mounted
  • Grid-Tied
  • Contract Documents
  • Layout Design
  • Earthwork
  • Perimeter Fencing
  • Project Management
  • Project Reporting to NSOE
Contact Us

Related Project Experience

Picture

Springville Composting Facility

Picture

Hyrum City 40kW Solar Project

Picture

Wasatch Resource Recovery

AQUA Engineering
Utah Office
​533 W 2600 S, Suite 275
Bountiful, UT 84010
801.299.1327
Colorado Office
7935 E Prentice Avenue, Suite 100
Greenwood Village, CO 80111
720.667.1250
Oregon Office
12725 SW Millikan Way, Suite 300
Beaverton, OR 97005
801.683.3733
Links
Solutions
Company
​​Team
Experience
News
​
Careers
Contact​​
Search
​
© 2026 AQUA Engineering. All Rights Reserved.