Elk Ridge City
Water  |  Water Distribution System Improvements


This project included the installation of approximately 1400 feet of 10-inch C-900 and 1350 feet of 8 inch C-900 PVC water line.  Several residential service laterals, fire hydrants and valves were also replaced as part of the project.  The pipelines were installed parallel to existing line so that service could be maintained to customers with minimal disruptions. Testing, flushing and disinfection were completed prior to taking the old lines out of service and making the connections to the new line. Asphalt roadway patching and re-vegetation of disturbed areas were also included.
Contact Us
Project Study:
Client
Elk Ridge City
Reference
David Jean, Public Works Director
Location
Elk Ridge, UT
Cost
$20,000
Features
  • PVC Water Line
  • Residential Service Laterals
  • Fire Hydrants
  • Valve Replacements
  • Re-Vegetation & Asphalt Roadway Patching

Related Project Experience

Picture

Hyrum City Water Improvements

Picture

Elk Ridge 1MG Prestressed Tank

Picture

Upper Freeze Creek Well

AQUA Engineering
Utah Office
533 W 2600 S Suite 275
Bountiful, UT 84010
801.299.1327​
Colorado Office
7935 E Prentice Avenue, Suite 100
​Greenwood Village, CO 80111
720.667.1250
Oregon Office
4145 SW Watson Avenue, Suite 350 - #347
Beaverton, OR 97005

801.683.3733
Links
Solutions
Company
​​Team
Experience
News​
​Careers
​​Contact
Search
© 2021 AQUA Engineering. All Rights Reserved.